
The project LUGAPORT universal trading terminal
Brief description of the designed transport terminal:
1464
metres’
The projected length
the quay wall is 1464 meters
Five berths for ships with draft up to 15 meters.
Depth at berths 17,5 meters
17.5
metres’
15
metres’
Processed fleet: ships of the class:
PANAMAX, NEW PANAMAX, BABY-CAPESIZE with a draft up to 15 meters
The projected terminals LUGAPORT :

Bulk and general cargo transshipment complex
16
million tons per year

The terminal is focused on export and import. The capacity of the terminal is 16 million tons per year
The terminal accepts 750 cars per day
750
wagons per day

1.26
million tons

Total storage capacity – 1,26 million tons
The nomenclature of goods, thousand tons:
- Coal – 380,4
- Ore (universal storage) – 204,3
- Ore (specialized storage) – 276,1
- Coke – 89,8
- Cast iron -130,4
- General cargo (outdoor storage) – 160,1
- General cargo (indoor storage) – 19,5

Grain and food cargo transshipment complex
8.26
million tons per year

The capacity of the terminal is 8,26 million tons per year
The capacity of reception by rail – 350 cars per day
350
wagons per day

380
thousand tons

Total storage capacity – 380 thousand tons
