THE PROJECT LUGAPORT MULTIPURPOSE TRADING TERMINAL
Brief description of the designed transport terminal:
1464
meters
The projected length of
the quay wall is 1464 meters
Five berths for ships with draft up to 15 meters.
Depth at berths is 17.5 meters
17.5
meters
15
meters
Processed fleet: ships of the class:
PANAMAX, NEW PANAMAX, BABY-CAPESIZE with a draft up to 15 meters
The projected terminals of LUGAPORT:
Bulk and general cargo transshipment complex
16
million tonnes per year
The terminal is focused on export and import. The capacity of the terminal is 16 million tons per year
The terminal accepts 750 railcars per day
750
railcars per day
1.26
million tonnes
Total storage capacity – 1.26 million tonnes
The list of accepted goods, thousand tonnes:
- Ore (specialized storage) – 276.1
- Coal – 380.4
- Coke – 89.8
- Ore (iniversal storage) – 204.3
- Cast iron – 130.4
- General cargo (outdoor storage) – 160.1
- General cargo (indoor storage) – 19.5
Grain and food cargo transshipment complex
8.26
million tonnes per year
The capacity of the terminal is 8,26 million tonnes per year
Railcar throughput capacity – 350 units per day
350
railcars per day
380
thousand tonnes
Total storage capacity – 380 thousand tonnes