INFRASTRUCTURE

THE PROJECT LUGAPORT MULTIPURPOSE TRADING TERMINAL

Brief description of the designed transport terminal:

1464

meters

The projected length of
the quay wall is 1464 meters 

Five berths for ships with draft up to 15 meters.
Depth at berths is 17.5 meters 

17.5

meters

15

meters

Processed fleet: ships of the class:
PANAMAX, NEW PANAMAX, BABY-CAPESIZE with a draft up to 15 meters

The projected terminals of LUGAPORT:

Bulk and general cargo transshipment complex

16

million tonnes per year

The terminal is focused on export and import. The capacity of the terminal is 16 million tons per year

The terminal accepts 750 railcars per day

750

railcars per day

1.26

million tonnes

Total storage capacity – 1.26 million tonnes

The list of accepted goods, thousand tonnes:

 

  • Ore (specialized storage) – 276.1
  • Coal – 380.4
  • Coke – 89.8
  • Ore (iniversal storage) – 204.3
  • Cast iron – 130.4
  • General cargo (outdoor storage) – 160.1
  • General cargo (indoor storage) – 19.5

Grain and food cargo transshipment complex

8.26

million tonnes per year

The capacity of the terminal is 8,26 million tonnes per year

Railcar throughput capacity – 350 units per day

350

railcars per day

380

thousand tonnes

Total storage capacity – 380 thousand tonnes